How to manage construction sites: Hot topics and structured guides on the Internet in the past 10 days
With the rapid development of the construction industry, construction site management has become a hot topic recently. This article combines the hot content of the entire network in the past 10 days to provide structured solutions from the four dimensions of personnel, safety, progress, and cost.
1. Recent hot topics in construction site management

| Topic classification | focus | heat index |
|---|---|---|
| Intelligent management | BIM technology application | ★★★★★ |
| safe production | Specifications for working at heights | ★★★★☆ |
| people management | Real-name system for migrant workers | ★★★★☆ |
| Environmental requirements | New regulations on dust control | ★★★☆☆ |
2. Structured construction site management plan
1. Personnel management
| Manage projects | Specific requirements | Implementation tools |
|---|---|---|
| Real-name management | 100% face recognition attendance | Smart construction site system |
| Skills training | ≥8 hours of safety training per month | VR simulation equipment |
| Team assignment | Define areas of responsibility by type of work | Electronic business card system |
2. Security management
| Risk type | Prevention and control measures | Check frequency |
|---|---|---|
| Falling from high altitude | Double protective rope + anti-fall net | Daily inspection |
| mechanical damage | Equipment limit device + warning area | Weekly special inspection |
| Electricity safety | Level 3 power distribution level 2 protection | Monthly electrician assessment |
3. Progress management
| stage | key node | progress control |
|---|---|---|
| Basic construction | Earth excavation completed | ±3 days error |
| Main structure | Concrete pouring for each layer | BIM progress simulation |
| decoration decoration | Material arrival acceptance | Place order 7 days in advance |
4. Cost management
| cost type | Control indicators | Saving measures |
|---|---|---|
| Material fee | ≤95% of budget | Centralized purchasing + residual material recycling |
| Labor cost | Working hour utilization rate ≥85% | Intelligent scheduling system |
| Machinery fee | Idle rate ≤10% | Shared rental platform |
3. Suggestions on hot technology applications
Based on recent industry trends, the following innovative management methods are recommended:
•Drone inspection: Daily automatic cruise shooting, AI identification of safety hazards
•Smart helmet: Real-time positioning + vital signs monitoring
•environmental monitoring system: PM2.5 and noise data are uploaded to the monitoring platform in real time
Conclusion
Effective construction site management requires systematic thinking. Through the "four modernizations" management of personnel standardization, safety visualization, progress digitization, and cost refinement, combined with the latest technological means, management efficiency can be improved by more than 30%. It is recommended that managers regularly pay attention to new regulations of the Ministry of Housing and Urban-Rural Development and industry technical white papers, and continue to optimize management plans.
check the details
check the details